Part 193 — Liquefied Natural Gas Facilities: Federal Safety Standards
Current through Sep 25, 2026
Authority: 49 U.S.C. 5103, 60102, 60103, 60104, 60108, 60109, 60110, 60113, 60118; and 49 CFR 1.53.
Source: 45 FR 9203, Feb. 11, 1980, unless otherwise noted.
Editorial Note: Nomenclature changes to part 193 appear at 71 FR 33408, June 9, 2006.
Sections
- § 193.2001 Scope of part.
- § 193.2003 [Reserved]
- § 193.2005 Applicability.
- § 193.2007 Definitions.
- § 193.2009 Rules of regulatory construction.
- § 193.2011 Reporting.
- § 193.2013 What documents are incorporated by reference partly or wholly in this part?
- § 193.2015 [Reserved]
- § 193.2017 Plans and procedures.
- § 193.2019 Mobile and temporary LNG facilities.
- § 193.2051 Scope.
- § 193.2055 [Reserved]
- § 193.2057 Thermal radiation protection.
- § 193.2059 Flammable vapor-gas dispersion protection.
- §§ 193.2061-193.2065 [Reserved]
- § 193.2067 Wind forces.
- §§ 193.2069-193.2073 [Reserved]
- § 193.2101 Scope.
- §§ 193.2103-193.2117 [Reserved]
- § 193.2119 Records
- §§ 193.2121-193.2153 [Reserved]
- § 193.2155 Structural requirements.
- §§ 193.2157-193.2159 [Reserved]
- § 193.2161 Dikes, general.
- §§ 193.2163-193.2165 [Reserved]
- § 193.2167 Covered systems.
- §§ 193.2169-193.2171 [Reserved]
- § 193.2173 Water removal.
- §§ 193.2175-193.2179 [Reserved]
- § 193.2181 Impoundment capacity: LNG storage tanks.
- §§ 193.2183-193.2185 [Reserved]
- § 193.2187 Nonmetallic membrane liner.
- §§ 193.2189-193.2233 [Reserved]
- § 193.2301 Scope.
- § 193.2303 Construction acceptance.
- § 193.2304 Corrosion control overview.
- §§ 193.2305-193.2319 [Reserved]
- § 193.2321 Nondestructive tests.
- §§ 193.2323-193.2329 [Reserved]
- § 193.2401 Scope.
- §§ 193.2403-193.2439 [Reserved]
- § 193.2441 Control center.
- § 193.2443 [Reserved]
- § 193.2445 Sources of power.
- § 193.2501 Scope.
- § 193.2503 Operating procedures.
- § 193.2505 Cooldown.
- § 193.2507 Monitoring operations.
- § 193.2509 Emergency procedures.
- § 193.2511 Personnel safety.
- § 193.2513 Transfer procedures.
- § 193.2515 Investigations of failures.
- § 193.2517 Purging.
- § 193.2519 Communication systems.
- § 193.2521 Operating records.
- § 193.2601 Scope.
- § 193.2603 General.
- § 193.2605 Maintenance procedures.
- § 193.2607 Foreign material.
- § 193.2609 Support systems.
- § 193.2611 Fire protection.
- § 193.2613 Auxiliary power sources.
- § 193.2615 Isolating and purging.
- § 193.2617 Repairs.
- § 193.2619 Control systems.
- § 193.2621 Testing transfer hoses.
- § 193.2623 Inspecting LNG storage tanks.
- § 193.2625 Corrosion protection.
- § 193.2627 Atmospheric corrosion control.
- § 193.2629 External corrosion control: buried or submerged components.
- § 193.2631 Internal corrosion control.
- § 193.2633 Interference currents.
- § 193.2635 Monitoring corrosion control.
- § 193.2637 Remedial measures.
- § 193.2639 Maintenance records.
- § 193.2701 Scope.
- § 193.2703 Design and fabrication.
- § 193.2705 Construction, installation, inspection, and testing.
- § 193.2707 Operations and maintenance.
- § 193.2709 Security.
- § 193.2711 Personnel health.
- § 193.2713 Training: operations and maintenance.
- § 193.2715 Training: security.
- § 193.2717 Training: fire protection.
- § 193.2719 Training: records.
- § 193.2801 Fire protection.
- §§ 193.2803-193.2821 [Reserved]
- § 193.2901 Scope.
- § 193.2903 Security procedures.
- § 193.2905 Protective enclosures.
- § 193.2907 Protective enclosure construction.
- § 193.2909 Security communications.
- § 193.2911 Security lighting.
- § 193.2913 Security monitoring.
- § 193.2915 Alternative power sources.
- § 193.2917 Warning signs.