49 CFR § 236.101 Rules, Standards, and Instructions Governing the Installation, Inspection, Maintenance, and Repair of Signal and Train Control Systems, Devices, and Appliances

§ 236.101 Purpose of inspection and tests; removal from service of relay or device failing to meet test requirements.

Current through Sep 25, 2026 · Read all of Part 236

The following inspections and tests shall be made in accordance with specifications of the carrier, subject to approval of the FRA, to determine if the apparatus and/or equipment is maintained in condition to perform its intended function. Electronic device, relay, or other electromagnetic device which fails to meet the requirements of specified tests shall be removed from service, and shall not be restored to service until its operating characteristics are in accordance with the limits within which such device or relay is designed to operate.

[49 FR 3384, Jan. 26, 1984]

← § 236.76 Tagging of wires and interference of wires or tags with signal apparatus.§ 236.102 Semaphore or searchlight signal mechanism. →