49 CFR § 195.308 Transportation of Hazardous Liquids by Pipeline

§ 195.308 Testing of tie-ins.

Current through Sep 25, 2026 · Read all of Part 195

⚠ 19 pending changes to Part 195

Pipe associated with tie-ins must be pressure tested, either with the section to be tied in or separately.

[Amdt. 195-22, 46 FR 38360, July 27, 1981, as amended by Amdt. 195-51, 59 FR 29385, June 7, 1994]

← § 195.307 Pressure testing aboveground breakout tanks.§ 195.310 Records. →