49 CFR § 192.376 Transportation of Natural and Other Gas by Pipeline: Minimum Federal Safety Standards

§ 192.376 Installation of plastic service lines by trenchless excavation.

Current through Sep 25, 2026 · Read all of Part 192

⚠ 31 pending changes to Part 192

Plastic service lines installed by trenchless excavation must comply with the following:

(a) Each operator shall take practicable steps to provide sufficient clearance for installation and maintenance activities from other underground utilities and structures at the time of installation.

(b) For each pipeline section, plastic pipe and components that are pulled through the ground must use a weak link, as defined by § 192.3, to ensure the pipeline will not be damaged by any excessive forces during the pulling process.

[Amdt. 192-124, 83 FR 58719, Nov. 20, 2018]

← § 192.375 Service lines: Plastic.§ 192.377 Service lines: Copper. →