48 CFR § 36.302 Construction and Architect-Engineer Contracts

36.302 Scope of work.

Current through · Read all of Part 36

The agency shall develop, either in-house or by contract, a scope of work that defines the project and states the Government's requirements. The scope of work may include criteria and preliminary design, budget parameters, and schedule or delivery requirements. If the agency contracts for development of the scope of work, the procedures in subpart 36.6 shall be used.

← 36.301 Use of two-phase design-build selection procedures.36.303 Procedures. →