46 CFR § 175.122 General Provisions

§ 175.122 Load lines.

Current through Sep 25, 2026 · Read all of Part 175

A vessel of 24 meters (79 feet) in length or more, the keel of which was laid or that was at a similar stage of construction on or after July 21, 1968, and that is on a voyage other than a domestic voyage is subject to load line assignment, certification, and marking under subchapter E (Load Lines) of this chapter.

[CGD 85-080, 61 FR 947, Jan. 10, 1996, as amended by USCG-2014-0688, 79 FR 58288, Sept. 29, 2014]

← § 175.120 Vessels on an international voyage.§ 175.124 Requirements for DUKW Amphibious Passenger Vessels. →