40 CFR § 264.54 Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities

§ 264.54 Amendment of contingency plan.

Current through Aug 22, 2025 · Read all of Part 264

⚠ 1 pending change to Part 264

The contingency plan must be reviewed, and immediately amended, if necessary, whenever:

(a) The facility permit is revised;

(b) The plan fails in an emergency;

(c) The facility changes—in its design, construction, operation, maintenance, or other circumstances—in a way that materially increases the potential for fires, explosions, or releases of hazardous waste or hazardous waste constituents, or changes the response necessary in an emergency;

(d) The list of emergency coordinators changes; or

(e) The list of emergency equipment changes.

[45 FR 33221, May 19, 1980, as amended at 50 FR 4514, Jan. 31, 1985; 53 FR 37935, Sept. 28, 1988]

← § 264.53 Copies of contingency plan.§ 264.55 Emergency coordinator. →