36 CFR § 9.63 Minerals Management

§ 9.63 How long will I have to conduct my reconnaissance surveys?

Current through Oct 16, 2026 · Read all of Part 9

The duration of your temporary access permit will be stated in the permit, based upon the scope of the reconnaissance surveys needed. The Regional Director may, upon written request, extend the term of the temporary access permit.

← § 9.62 When will the NPS grant a temporary access permit?§ 9.70 Do I need an operations permit for accessing oil and gas rights from outside the System unit boundary? →