33 CFR § 117.620 Drawbridge Operation Regulations

§ 117.620 Westport River—East Branch.

Current through Sep 9, 2026 · Read all of Part 117

⚠ 5 pending changes to Part 117

The Westport Point Bridge, mile 1.2 at Westport, shall operate as follows:

(a) Public vessels of the United States must be passed as soon as possible.

(b) The owners of this bridge shall provide and keep in good legible condition clearance gauges for each draw with figures not less than 12 inches high designed, installed, and maintained, according to the provisions of § 118.160 of this chapter.

(c) That the drawspan for the Westport Point Drawbridge, mile 1.2 at Westport, must open on signal if at least 24 hours notice is given.

[CGD1-91-014, 56 FR 41462, Aug. 21, 1991, as amended by USCG-2001-10881, 71 FR 70311, Dec. 4, 2006]

← § 117.619 Taunton River.§ 117.621 West Bay. →