30 CFR § 250.751 Oil and Gas and Sulphur Operations in the Outer Continental Shelf

§ 250.751 Coiled tubing testing requirements.

Current through Jul 27, 2026 · Read all of Part 250

You must test the coiled tubing unit in accordance with § 250.737(a), (b), (c), (d)(9), and (d)(10). You must successfully pressure test the dual check valves to the rated working pressure of the connector, the rated working pressure of the dual check valve, expected surface pressure, or the collapse pressure of the coiled tubing, whichever is less. The test interval for coiled tubing operations must include a 10 minute high-pressure test for the coiled tubing string.

[84 FR 21984, May 15, 2019]

← § 250.750 What are the coiled tubing requirements?§ 250.760 What are the snubbing requirements? →